- Added URL validation for notification providers to ensure only valid http/https URLs are accepted. - Implemented tests for URL validation scenarios in the Notifications component. - Updated translations for error messages related to invalid URLs in multiple languages. - Introduced new hooks for managing security headers and access lists in tests. - Enhanced the ProviderForm component to reset state correctly when switching between add and edit modes. - Improved user feedback with update indicators after saving changes to notification providers. - Added mock implementations for new hooks in various test files to ensure consistent testing behavior.
27 lines
1.8 KiB
Markdown
27 lines
1.8 KiB
Markdown
# Supervisor Review - E2E Shard Timeout Investigation
|
|
|
|
Date: 2026-02-10
|
|
Last Updated: 2026-02-10 (Final Review)
|
|
Verdict: **APPROVED** ✅
|
|
|
|
## Final Review Result
|
|
|
|
All blocking findings have been resolved:
|
|
|
|
### ✅ Resolved Issues
|
|
- **Artifact inventory complete**: test-results JSON is now documented with reporter output and summary statistics. See [docs/reports/e2e_shard3_analysis.md](docs/reports/e2e_shard3_analysis.md#L11-L36).
|
|
- **CI confirmation checklist complete**: All required confirmations (timeout locations, cancellation search, OOM search, runner type, emergency port) are now marked [x] with evidence references. See [docs/reports/ci_workflow_analysis.md](docs/reports/ci_workflow_analysis.md#L206-L211).
|
|
|
|
## Verified Requirements
|
|
|
|
- ✅ Shard-to-test mapping evidence using `--list` is included. See [docs/reports/e2e_shard3_analysis.md](docs/reports/e2e_shard3_analysis.md#L78-L169).
|
|
- ✅ Reproduction steps include rebuild, start, environment variables, and exact commands. See [docs/reports/e2e_shard3_analysis.md](docs/reports/e2e_shard3_analysis.md#L189-L230) and [docs/reports/ci_workflow_analysis.md](docs/reports/ci_workflow_analysis.md#L73-L126).
|
|
- ✅ Remediations are labeled with P0/P1/P2. See [docs/reports/ci_workflow_analysis.md](docs/reports/ci_workflow_analysis.md#L187-L204).
|
|
- ✅ Evidence correlation includes job start/end timestamps. See [docs/reports/e2e_shard3_analysis.md](docs/reports/e2e_shard3_analysis.md#L174-L186).
|
|
- ✅ Workflow changes align with spec section 9 (timeout=60, per-shard outputs, diagnostics, artifacts).
|
|
- ✅ All spec requirements from [docs/plans/current_spec.md](docs/plans/current_spec.md) are satisfied.
|
|
|
|
## Decision
|
|
|
|
**APPROVED**. The investigation reports and workflow changes meet all requirements. QA phase may proceed.
|