1.2 KiB
1.2 KiB
QA Report — PR-1 Caddy Compatibility Closure
- Date: 2026-02-23
- Scope: PR-1 compatibility slice only
- Decision: Ready to close PR-1
Reviewer Checklist
| Gate | Status | Reviewer Action |
|---|---|---|
| Targeted Playwright blocker rerun | PASS | Confirm targeted tests are no longer failing. |
| Compatibility matrix rerun (isolated output) | PASS | Confirm A/B/C rows exist for amd64 and arm64. |
| Promotion guard decision | PASS | Confirm promotion depends only on Scenario A (both architectures). |
| Non-drift runtime default | PASS | Confirm default remains non-candidate. |
| Focused pre-commit and CodeQL findings gate | PASS | Confirm no blocking findings in this slice. |
Evidence Snapshot
- Targeted rerun passed for prior blocker tests.
- Matrix run completed with full rows and PASS outcomes in isolated output.
- Promotion gate condition met: Scenario A passed on linux/amd64 and linux/arm64.
- Candidate path remains opt-in; default path remains stable.
Open Risks to Monitor
- Matrix artifact contamination if shared output directories are reused.
- Candidate behavior drift if default build args are changed in future slices.
Final Verdict
PR-1 closure gates are satisfied for the compatibility slice.