Files
Charon/docs
GitHub Actions 028189ece0 feat: complete Phase 2 testing infrastructure remediation and discovery
## Summary
- Phase 2.1 critical fixes implemented and verified:
  * Uptime monitor initial state logic validated (no code change needed)
  * Backups guest authorization check added (frontend role gating)
  * Docker integration element IDs fixed for test selector reliability

- Phase 2.2 discovery completed with root cause analysis:
  * User management invite endpoint identified: blocking email send (SMTP blocking)
  * Docker integration code quality verified as sound
  * Async email pattern recommended for Phase 2.3 implementation

- Comprehensive QA verification executed:
  * Full Phase 2 E2E suite run in headless mode (90%+ pass rate)
  * GORM security scanner passed (0 CRITICAL/HIGH app code issues)
  * Infrastructure validation complete (Docker, ports, containers operational)

## Critical Findings
- CVE-2024-45337 in golang.org/x/crypto/ssh (dependency update required)
- InviteUser handler blocks on SMTP (design pattern issue, documented for async refactor)
- Test authentication token refresh needed for Phase 3

## Artifacts Created
- Phase 2 discovery documents (user management, Docker integration)
- Uptime monitor contract test validating initial state behavior
- Comprehensive security and quality reports in docs/reports/ and docs/security/

## Next Steps
1. Update crypto dependency (1 hour) - CRITICAL
2. Implement async email queuing for invites (2-3 hours) - HIGH
3. Add test auth token refresh mechanism (30 min) - MEDIUM
4. Phase 3 security enforcement testing can proceed in parallel
2026-02-09 23:31:00 +00:00
..