Add missing emergency token environment variable to all E2E test workflows to
fix security teardown failures in CI. Without this token, the emergency reset
endpoint returns 501 "not configured", causing test teardown to fail and
leaving ACL enabled, which blocks 83 subsequent tests.
Changes:
Add CHARON_EMERGENCY_TOKEN to docker-build.yml test-image job
Add CHARON_EMERGENCY_TOKEN to e2e-tests.yml e2e-tests job
Add CHARON_EMERGENCY_TOKEN to playwright.yml playwright job
Verified:
Docker build strategy already optimal (build once, push to both GHCR + Docker Hub)
Testing strategy correct (test once by digest, validates both registries)
All workflows now have environment parity with local development setup
Requires GitHub repository secret:
Name: CHARON_EMERGENCY_TOKEN
Value: 64-char hex token (e.g., from openssl rand -hex 32)
Related:
Emergency endpoint rate limiting removal (proper fix)
Local emergency token configuration (.env, docker-compose.local.yml)
Security test suite teardown mechanism
Refs #550
Update branch triggers and downstream workflow logic to support all
branches defined in docker-build.yml (main, development, feature/**).
Changes:
docker-build.yml: Expand branch glob to feature/**, use branch-based tags
playwright.yml: Replace is_beta_push with generic is_push detection
security-pr.yml: Same branch-agnostic pattern
supply-chain-pr.yml: Same pattern, skip PR comments for push events
The workflows now support any push that triggers docker-build:
main branch → tag: latest
development branch → tag: dev
feature/* branches → tag: {branch-name}
Pull requests → tag: pr-{number}
Dynamic artifact naming:
Push events: push-image (shared across all branches)
Pull requests: pr-image-{number}
This ensures CI/CD pipelines work for stable releases, bug fixes,
and new feature development without hardcoded branch names.
Implements all 13 fixes identified in the CI/CD audit against
github-actions-ci-cd-best-practices.instructions.md
Critical fixes:
Remove hardcoded encryption key from playwright.yml (security)
Fix artifact filename mismatch in supply-chain-pr.yml (bug)
Pin GoReleaser to ~> v2.5 instead of latest (supply chain)
High priority fixes:
Upgrade CodeQL action from v3 to v4 in supply-chain-pr.yml
Add environment protection for release workflow
Fix shell variable escaping ($$ → $) in release-goreleaser.yml
Medium priority fixes:
Add timeout-minutes to playwright.yml (20 min)
Add explicit permissions to quality-checks.yml
Add timeout-minutes to codecov-upload.yml jobs (15 min)
Fix benchmark.yml permissions (workflow-level read, job-level write)
Low priority fixes:
Add timeout-minutes to docs.yml jobs (10/5 min)
Add permissions block to docker-lint.yml
Add timeout-minutes to renovate.yml (30 min)
Separate PR-specific tests from docker-build.yml into dedicated workflows
that trigger via workflow_run. This creates a cleaner CI architecture where:
playwright.yml: E2E tests triggered after docker-build completes
security-pr.yml: Trivy binary scanning for PRs
supply-chain-pr.yml: SBOM generation + Grype vulnerability scanning
- Updated context key definitions in dns_provider_service_test.go to use string constants instead of custom types for user_id, client_ip, and user_agent.
- Ensured proper context values are set in audit logging tests to avoid defaulting to "system" or empty values.
- Enhanced in-memory SQLite database setup in credential_service_test.go to use WAL mode and busy timeout for better concurrency during tests.
- Updated current specification to reflect the integration of Staticcheck into pre-commit hooks.
- Added problem statement, success criteria, and implementation plan for Staticcheck integration.
- Enhanced QA validation report to confirm successful implementation of Staticcheck pre-commit blocking.
- Created new Playwright configuration and example test cases for frontend testing.
- Updated package.json and package-lock.json to include Playwright and related dependencies.
- Archived previous QA report for CI workflow documentation updates.